SN 100 MC (SLE)
Advanced epoxy mid-coat flooring system engineered for exceptional build, durability, seamless integrity and chemical resistance.
SN 100 MC (SLE) — Full Technical Details
Description What it is⌄
SN 100 MC (SLE) is an advanced three-component epoxy mid-coat flooring system, engineered to deliver exceptional build, durability, and performance. It forms a dense, seamless intermediate layer and is typically installed at a nominal thickness of 1–4 mm for optimal load distribution and long-term service life.
Uses Where to use⌄
A high-performance epoxy mid-coat system providing excellent chemical resistance and a durable, hard-wearing floor finish. Suitable as a protective overlay on newly installed floors and for repair/refurbishment of existing flooring.
Benefits Performance⌄
- Impact resistance.
- Seamless & hygienic finish (no crevices where dirt and bacteria can dwell).
- Temperature resistant 0°C to 85°C.
- Excellent chemical resistance.
- High abrasion resistance.
- Low odor during installation.
- Smooth surface finish.
Substrate Compatible bases⌄
Suitable for application over sound substrates including concrete, wood, tile, and metal. Application over asphalt or previously painted surfaces is not recommended, as it may compromise adhesion and long-term performance.
System Options Cove base⌄
Cove Base
For a continuous and integral seal at the floor–wall junction, coving may be formed using SN 100 MC (SLE) Coving Mortar in conjunction with SN 100 Primer. This improves hygiene, durability, and protection at critical joint interfaces.
Technical Data Key values⌄
| Parameter | Value | Notes |
|---|---|---|
| System Type | 3-component epoxy mid-coat | Intermediate layer; dense & seamless |
| Nominal Thickness | 1–4 mm | Typically installed in this range |
| Coverage | ~1.8 kg/m² per 1 mm thickness | Theoretical; depends on substrate/conditions |
| Packaging | 22 kg per set | Pre-measured: Part A + Part B + Part C |
| Pot Life | ~10–15 minutes @ 30°C | Varies with temperature |
| Full Chemical Cure | ~12 hours | As stated |
| Temperature Resistance | 0°C to 85°C | As stated |
Physical / Chemical Characteristics
| Characteristic | Value | Standard |
|---|---|---|
| Compressive Strength | 50 N/mm² (after 7 days) | ASTM C-579 |
| Tensile Strength | 8 N/mm² | ASTM C-307 |
| Flexural Strength | 20 N/mm² | ASTM C-580 |
| Hardness | 80–84 (Shore D) | ASTM C-2240 / Shore D Durometer |
| Abrasion Resistance | 30 mg loss / 1000 cycles (1 kg load, H22 wheels) | ASTM D4060 Taber Abrader |
| Coefficient of Thermal Expansion | α ≈ 2.7 × 10-5 per °C | ASTM E381, ASTM D-696, ISO 11359 |
| Service Temperature Range | -20°C to +60°C | As stated |
| Bond Strength | > 2.5 MPa (100% concrete failure) | ASTM C-4541 |
| Impact Resistance | > 140 in./lbs. | ASTM C-4226 |
| Water Absorption | 0% | ASTM C-413 |
| Slip Resistance | Dry 70 / Wet 25 | Pendulum Slip Test |
Hardening Time At 30°C⌄
The PDF indicates “Hardening Time — At 30°C allow:” but does not provide the numeric values. For accuracy, confirm the timing from your official internal method statement or project specification.
Substrate Preparation Bond critical⌄
Proper preparation is critical to ensure adequate bond. The substrate must be dry and free of grease, fats, oil, and laitance. Use totally enclosed shot blasting or scarification to create an open textured surface (sandpaper-like profile).
Mixing 30 sec + 30 sec⌄
- Add Part A and Part B into the mixing pail.
- Mix with a blender for 30 seconds.
- Add Part C and mix again for 30 seconds.
Pot Life Working time⌄
Working time is approximately 10–15 minutes at 30°C. Working time varies with temperature.
Application Step-by-step⌄
- Use a screed rake to distribute the mixed material onto the floor.
- Use a V-notched hand trowel and pull at right angles to the floor.
- Use a spiked roller to release air and help the aggregate settle, allowing liquids to come to the surface.
Shelf Life 12 months⌄
Store unopened in dry conditions at 25°C to 35°C. Avoid excessive heat and do not allow material to freeze. Shelf life is 12 months when stored in original, unopened packaging under recommended conditions.
Cleaning Up Solvents⌄
Clean mixing and application equipment immediately after use. Use toluene or xylene. Observe all fire and health precautions when handling or storing solvent.
Important Avoid contamination⌄
For extended interruptions (e.g., lunch break), thoroughly clean mixing paddles and containers before suspending work. This prevents contamination from partially cured residues, which can severely impair workability, trowelability, and final floor finish quality.
Caution PPE & first aid⌄
Avoid contact with Part A and Part B as they may cause skin and/or eye irritation. In case of contact, flush with clean water for at least 15 minutes and seek medical attention. Use impervious gloves; wash hands thoroughly with soap and water after use and before eating/smoking.
Further Information Company & support⌄
SN Chemical Industries Ltd. supplies engineered construction products including industrial polymer floor and wall coatings, waterproofing, structural repair materials, and specialty protective coatings.
SN Chemical Industries Ltd.